Include the complete rotating mass, centre of gravity, workpiece envelope and welding access when requesting a positioner proposal. Check which drawing revision defines the fixture interface and whether every intended part variant is included in the load review.
A closer look at your application
Practical questions for industrial automation and plastic-container projects. These engineering notes are buying guidance, not customer testimonials.
Every application starts with the part
From welded components to finished containers, each application starts with its own drawings, materials and process requirements.
Project planning guide
Share the robot model, working envelope, required travel and floor layout when discussing a robot track or external axis. Mark each working position and ask how cable routing, loading access and neighbouring stations affect the proposed travel.
Project planning guide
Define the welding, handling or riveting process, incoming part condition and interfaces to the surrounding production line. List upstream and downstream signals, the equipment kept in place and who will confirm each integration interface.
Project planning guide
Start with the bottle drawing, resin grade, neck finish and intended use. Discuss the equipment and mold as a connected process. Confirm that the container drawing, resin grade and machine-and-mold proposal use the same product definition.
Project planning guide
Provide the container profile, neck detail, appearance requirements and the machine configuration for the mold discussion. Identify the machine interface and approved container revision, then agree what samples will be used for mold evaluation.
Project planning guide
Consider the bottle shape, closure interface and intended use together. Material and process suitability need project-specific review. Describe the closure, intended handling and appearance expectations so the review covers the complete bottle application.
Project planning guide
Specify the intended market and any required product documentation. A material choice alone does not establish compliance. Identify the product tests and documents required by your market, and assign responsibility for their review before approval.
Project planning guide
Share the packaging use, cleanliness needs and required documentation so the technical team can review the scope. Separate equipment supply from any application-specific cleanliness, testing or documentation requirements.
Project planning guide
Discuss surface finish, container geometry and closure compatibility with sample references and drawings. Use an agreed reference for surface appearance and check the closure fit alongside the container geometry.
Project planning guide

