Mold procurement

What should you check before ordering a mold?

13 November 2026
Six-cavity injection stretch blow mold

SanSong technical guide · · Procurement planning guide

Confirm the container design, material and machine interface before approving the mold scope. Use the same drawing revision across the project, define evaluation conditions and identify handover documents. Record open decisions alongside agreed requirements rather than leaving assumptions inside a quotation.

This buying guide helps prepare a technical discussion. The final equipment configuration and commercial scope are confirmed for each project.

Control the product definition

Use an identified revision for the container and neck drawings. Include the closure interface and features that need specific evaluation. Distinguish reference samples from approved requirements. Review the effect of any design revision before relying on an earlier proposal.

A clear application brief connects the product, the equipment and the acceptance criteria.

Confirm machine compatibility

Provide the machine model and required interface information. Identify existing components intended for reuse.

Have compatibility assumptions recorded explicitly. An equipment family name is not a complete interface specification.

  • Identify the approved container and neck drawing revisions.
  • Confirm the resin grade and intended closure interface.
  • Provide the machine model and verified interface information.
  • Identify existing mold components intended for reuse.

Record the assumptions behind this decision and the information still needed from each project party.

Plan sample evaluation

Agree the material, container version and conditions for sample production. Define dimensions and appearance features to check.

Identify reviewers and any external testing outside the mold supply scope before sample approval is expected.

Clarify delivery scope

Review supplied components, identification, drawings and maintenance information in the written offer. Document commercial terms, technical acceptance and sample approval separately; completing one does not prove the others.

Review the preparation checklist

Use the checklist to identify missing inputs, then assign an owner and a review date to each open question.

  • Define samples, material and conditions for evaluation.
  • Assign dimensional, appearance and external-test reviewers.
  • Agree supplied components, drawings and maintenance information.
  • Document open decisions, acceptance and commercial terms separately.

Keep approved requirements and open decisions separate. Review revisions with the people responsible for operation, maintenance and acceptance.

Confirm scope and responsibilities

Ask the relevant business team to confirm the proposed configuration, supplied items, exclusions and next evaluation step in writing.

Start your project discussion

Prepare approved container revision and material definition. Explore the related equipment or request an engineering quotation.

Business-scope source: SanSong published product documentation (Liuzhou Sansong Automation Technology Co., Ltd.). The preparation advice above is editorial guidance. Final configuration, performance, scope and acceptance criteria are confirmed in the project quotation.

Continue exploring

More questions before the next project

Ready to automate your workflow?

Talk to our experts and discover the right solution for your production.