TECHNICAL BUYING GUIDES
Better questions. Better project briefs.
FILTER BY ENGINEERING DISCIPLINE
Filter Technical Buying Guides by Project Topic
What should you prepare before a robot retrofit?
Buyer guide
Start with the existing process, actual workpiece and conditions the upgraded station must fit. Include drawings, current equipment, production requirements and the installation window. These inputs create a shared starting point before a robot, positioner or cell layout is chosen.

What should you prepare before a robot retrofit?

Buyer guide
13 November 2026
Three or four stations: where do you start?
Buyer guide
Procurement checklist

Buyer guide
13 November 2026
What material data does a bottle project need?
Buyer guide
Procurement checklist

Buyer guide
13 November 2026
What should you send with an equipment enquiry?
Buyer guide
Procurement checklist

Buyer guide
13 November 2026
How do you prepare for a mold changeover?
Buyer guide
Procurement checklist

Buyer guide
13 November 2026
What should you check before ordering a mold?
Buyer guide
Procurement checklist
PRE-RFQ PREPARATION & PROCESS SELECTION MATRIX
Quick Chief-Engineer Pre-RFQ Preparation & Process Selection Matrix
Verify process fit and gather the exact drawings, load envelopes, and resin specifications our Liuzhou engineering team needs to issue an accurate technical proposal.
Showing 5 of 5 process routes
| Process / Equipment Route | Target Container / Workpiece Profile | Required Pre-RFQ Engineering Inputs | Equipment & RFQ Links |
|---|---|---|---|
| One-Step ISBM (3-Station & 4-Station) | High-clarity cosmetic PETG/AS jars, PPSU/PP baby bottles, Tritan/PC sports bottles (≤ 4.6 L), wide-mouth pharma packers, two-color gradient vessels. | 2D/3D container & neck-finish drawing, resin grade, target gram weight, annual/shift output, 1–12 or 8–24 cavity preference. | ISBM Machines · Bottle Molds · EU Passports |
| Two-Stage Reheat SBM (Boundary Reference) | Dedicated single-SKU commodity water & carbonated beverage lines (> 15,000 bph) where bulk preform storage/conveyor ring marks are acceptable. | SanSong focuses exclusively on integrated one-step ISBM; if your volume/SKU profile favors two-stage SBM, we advise so during initial review. | One-Step Process |
| Extrusion Blow Molding / EBM (Boundary Reference) | Hollow integral grab-handles, detergent jugs, industrial jerrycans, or asymmetric automotive ducts requiring parison pinch-off. | Check for pinch-off scar or hollow handle geometry before requesting an ISBM mold quote. | ISBM vs IBM vs EBM |
| HL-Series Welding Positioners (1- & 2-Axis) | Automotive subframes, brackets, exhaust assemblies, and structural weldments requiring PA/1G flat-weld torch access. | Workpiece + fixture combined mass (kg), X/Y/Z center-of-gravity offset (mm), turning swing envelope, robot brand & controller model. | Welding Positioners · Positioner RFQ → |
| 7th-Axis Robot Linear Tracks & Turnkey Cells | EV aluminum battery trays, multi-meter frames, and dual-station welding/handling lines extending a single robot across stations. | Dimensioned shop layout, required effective travel stroke (m), robot + wrist dress-pack load, floor foundation & safety light-curtain boundaries. | Robot Tracks · Robotics RFQ → |




