Connect every part of the project
A production system brings equipment, tooling, controls and people together. Share your requirements and define how each part connects with the next.

Equipment works best when the interfaces are clear
Robot interfaces
Confirm the arm, controller, mounting and external-axis requirements. Provide the robot and controller identification, mounting details and required signals. Record which party confirms compatibility and which items are supplied by the customer.
System integration
Coordinate equipment layout, material flow and control signals. Share a layout and sequence diagram showing adjacent equipment. Assign ownership of interlocks, signal definitions and the checks at each supply boundary.
Process equipment
Review welding equipment, fixtures, molds or bottle-handling requirements. Identify existing welding sources, fixtures, molds and handling devices. Separate items supplied in the quotation from equipment retained or supplied by others.
Site preparation
Clarify utilities, foundations, access and installation responsibilities. Provide site dimensions and utility information for review. Agree who prepares foundations, unloading access and connections before installation is scheduled.
Project documents
Agree the drawings, technical records and acceptance information required. Use identified drawing revisions and a shared open-item list. Confirm document language, required records and the person responsible for approval.
Service planning
Discuss spare parts, operating guidance and support in the written scope. List the operating information, training topics and spare-part questions needed for handover. Confirm the agreed support scope and exclusions in writing.
Four conversations before the build

[1] Application review
Share the part or container, material, production requirement and existing equipment. Keep confirmed product requirements separate from assumptions. Identify the latest drawings and the person who can resolve open process questions.
[2] Configuration discussion
Review the equipment family, tooling and interfaces against your application. Record the proposed configuration and any customer-supplied items. Check mounting, controls, material flow and access before comparing quotations.
[3] Scope confirmation
Record the selected configuration, responsibilities, documents and acceptance criteria. Allocate every interface and document the exclusions. Agree how drawing changes, additional work and acceptance evidence will be reviewed.
[4] Delivery planning
Confirm commercial terms, site readiness, delivery arrangements and service scope. Assign owners for packing information, unloading, installation conditions and handover records. Treat dates as commitments only when confirmed in the order.