Skip to content
Equipment enquiries

What should you send with an equipment enquiry?

13 November 2026
Measuring a component to prepare an equipment project brief

SanSong technical guide · · Procurement planning guide

Explain what you need to make or automate and include the drawings, samples and operating requirements already available. Identify the relevant business area. Separate confirmed facts from open decisions, and describe the location, timing constraints and information needed to compare proposals.

This buying guide helps prepare a technical discussion. The final equipment configuration and commercial scope are confirmed for each project.

Describe the desired result

Describe the product or operation before choosing a machine. State the current problem and the outcome you want to assess.

  1. State what you need to make or automate and why.
  2. Identify the relevant automation or container-production business.
  3. Attach drawings, materials and available sample information.

If replacing equipment, identify what must remain compatible. Keep the practical objective clear while the configuration is still being reviewed.

Share the product information

Provide drawings, dimensions, materials and representative photographs or samples. Include fixtures for automation and neck details for bottles.

Mark preliminary files clearly and list details awaiting confirmation by your design or production team.

A clear application brief connects the product, the equipment and the acceptance criteria.

Explain project conditions

Share space, utilities, existing equipment and the planned product range. Explain the target production requirement.

Include installation windows and sample-approval milestones. Distinguish a desired schedule from an agreed delivery date.

Ask for a comparable scope

Ask for the proposed equipment, included services, exclusions, assumptions and next evaluation step to be stated. Compare defined scopes and responsibilities rather than headline prices with different underlying conditions.

Review the preparation checklist

Use the checklist to identify missing inputs, then assign an owner and a review date to each open question.

  • Separate approved requirements from preliminary assumptions.
  • Describe current equipment, available space and utilities.
  • Explain the product range and target production requirement.

Confirm scope and responsibilities

Keep approved requirements and open decisions separate. Review revisions with the people responsible for operation, maintenance and acceptance.

Plan the next discussion

Ask the relevant business team to confirm the proposed configuration, supplied items, exclusions and next evaluation step in writing.

Start your project discussion

Prepare project objective, business line and current process. Discuss your enquiry or request an engineering quotation.

Business-scope source: SanSong published product documentation (Liuzhou Sansong Automation Technology Co., Ltd.). The preparation advice above is editorial guidance. Final configuration, performance, scope and acceptance criteria are confirmed in the project quotation.

Continue exploring

More questions before the next project

Ready to automate your workflow?

Talk to our experts and discover the right solution for your production.