Explain where the robot needs to work, what it carries and how it connects to the production process. A useful track brief covers working positions, layout, robot model, tooling, cable routing and control interfaces. Travel distance alone is not a complete selection specification.
This buying guide helps prepare a technical discussion. The final equipment configuration and commercial scope are confirmed for each project.
Map the working positions
Mark each station and the relevant part and fixture locations on a dimensioned layout. Include approach directions.
Reserve the access needed for people, loading and maintenance. A nominal travel length does not prove every operation is accessible.
A clear application brief connects the product, the equipment and the acceptance criteria.
List everything that moves
Identify the robot model, mounting arrangement, tooling and any carried workpiece. Describe hoses, cables and utility needs.
- Mark every required working position on the production layout.
- Identify the robot model, mounting and tooling arrangement.
- Include workpieces, cables and utilities in the moving-load review.
- Record loading access, obstructions and maintenance clearances.
Include product variations so the review does not depend on one incomplete description of the moving assembly.
Describe the installation
Provide floor or overhead space, obstructions and access constraints. Note foundations and support structures that need review.
Ask for installation responsibilities and interfaces with adjacent equipment to be allocated in the technical proposal.
Review the operating sequence
Explain when the robot travels, when parts are loaded and how neighbouring stations interact. Include restart and recovery. Agree how positioning, travel and coordinated operation will be evaluated under the intended project conditions.
- Provide floor or overhead support information for review.
- Describe travel, processing and neighbouring-station timing.
- Allocate control, installation and equipment-interface responsibilities.
- Agree checks for travel, positioning and coordinated operation.
Review the preparation checklist
Use the checklist to identify missing inputs, then assign an owner and a review date to each open question.
Confirm scope and responsibilities
Keep approved requirements and open decisions separate. Review revisions with the people responsible for operation, maintenance and acceptance.
Start your project discussion
Prepare layout with all required working positions. Explore the related equipment or request an engineering quotation.
Business-scope source: SanSong published product documentation (Liuzhou Sansong Automation Technology Co., Ltd.). The preparation advice above is editorial guidance. Final configuration, performance, scope and acceptance criteria are confirmed in the project quotation.






