Begin with the complete rotating load and the welding task. The workpiece, fixture, centre of gravity, geometry and required orientations all matter. Include the loading method and available space, then ask for an engineering review of the proposed arrangement and interfaces.
This buying guide helps prepare a technical discussion. The final equipment configuration and commercial scope are confirmed for each project.
Document the complete load
Include clamps, fixtures and everything else that moves with the workpiece. Provide dimensions and the arrangement relative to the intended axes.
Describe the largest, heaviest and most awkward variants separately. One sample may not represent every loading condition.
Show the welding access
Mark weld locations and the positions needed to reach them. Explain whether the process is manual, robotic or part of a larger station.
- Provide workpiece and fixture drawings with their combined mass.
- Describe centre of gravity and the arrangement relative to each axis.
- Identify the largest and heaviest product variants separately.
Include torch access, loading clearance and areas that must stay unobstructed during the welding sequence.
Explain loading and changeover
Describe how the part arrives, how it is located and clamped, and how the completed assembly leaves.
Note lifting equipment, loading aids and the intended product mix. Review fixture interfaces alongside changeover needs.
A clear application brief connects the product, the equipment and the acceptance criteria.
Confirm interfaces and acceptance
Identify the robot, controller and welding equipment already selected, if any. Record responsibility for their integration.
- Mark weld locations and the required welding orientations.
- Show torch clearance, clamps and obstructed surfaces.
- Explain loading, locating, clamping and unloading methods.
- Identify the selected robot, controller and welding source.
Agree what will be demonstrated with representative parts, including movement, access and the operating sequence.
Review the preparation checklist
Use the checklist to identify missing inputs, then assign an owner and a review date to each open question.
Confirm scope and responsibilities
Keep approved requirements and open decisions separate. Review revisions with the people responsible for operation, maintenance and acceptance.
Start your project discussion
Prepare workpiece and fixture drawings, weights and load arrangement. Explore the related equipment or request an engineering quotation.
Business-scope source: SanSong published product documentation (Liuzhou Sansong Automation Technology Co., Ltd.). The preparation advice above is editorial guidance. Final configuration, performance, scope and acceptance criteria are confirmed in the project quotation.