Robot retrofits

What should you prepare before a robot retrofit?

13 November 2026
Take-out robot removing bottles from a SanSong molding machine

SanSong technical guide · · Procurement planning guide

Start with the existing process, actual workpiece and conditions the upgraded station must fit. Include drawings, current equipment, production requirements and the installation window. These inputs create a shared starting point before a robot, positioner or cell layout is chosen.

This buying guide helps prepare a technical discussion. The final equipment configuration and commercial scope are confirmed for each project.

Describe the existing process

Record the sequence from loading to unloading, including manual checks, waiting and rework. Representative samples are more useful than an ideal part alone.

A short process video and a simple sketch help explain how operators, fixtures and neighbouring equipment interact during a normal shift.

Define the part and its variation

Provide drawings, materials, dimensions and the weight of the workpiece and fixture. Identify surfaces that need to remain accessible.

Describe variation between products and batches. The review should cover the intended range rather than a single selected sample.

  • Document the current loading, processing and unloading sequence.
  • Provide a dimensioned layout with operator and maintenance access.
  • Identify equipment and tooling that must remain in use.
  • Supply current workpiece drawings and representative samples.
  • Describe product variations, fixture loads and locating surfaces.

Record the assumptions behind this decision and the information still needed from each project party.

Map the installation boundaries

Show floor space, access routes, utilities and existing controls. State which equipment remains and which interfaces may change.

Record the permitted shutdown window, restart requirements and responsibility for surrounding equipment before agreeing the installation sequence.

A clear application brief connects the product, the equipment and the acceptance criteria.

Agree the evaluation method

List the outcomes to assess, such as part quality, cycle sequence, changeover and operator access.

  1. List control signals and utilities available at the station.
  2. Define the permitted shutdown and restart conditions.
  3. Assign responsibility for changes to neighbouring equipment.
  4. Agree measurable checks with representative operating conditions.
  5. Record unresolved interfaces and the owner of each next action.

Define representative parts and operating conditions for each check. Keep assumptions and unresolved interfaces in the project record.

Review the preparation checklist

Use the checklist to identify missing inputs, then assign an owner and a review date to each open question.

Keep approved requirements and open decisions separate. Review revisions with the people responsible for operation, maintenance and acceptance.

Confirm scope and responsibilities

Ask the relevant business team to confirm the proposed configuration, supplied items, exclusions and next evaluation step in writing.

Start your project discussion

Prepare current process video, floor plan and equipment list. Explore the related equipment or request an engineering quotation.

Business-scope source: SanSong published product documentation (Liuzhou Sansong Automation Technology Co., Ltd.). The preparation advice above is editorial guidance. Final configuration, performance, scope and acceptance criteria are confirmed in the project quotation.

Continue exploring

More questions before the next project

Ready to automate your workflow?

Talk to our experts and discover the right solution for your production.